Handing over work at a shift change

What does the next shift need to know to carry straight on?

At a shift change, a lot of information is passed on verbally in a few minutes. Whatever isn’t said, the next shift only discovers when something goes wrong. AI can build a short brief from reports, the log and the schedule, with open deviations, an owner and the next check.

How do you start with one changeover?

Suppose the day shift hands over to the afternoon shift at 2 pm. Give AI the day’s reports, the team leader’s log and the afternoon schedule. Ask for a shift brief.

Fictional example

Shift brief, 2 pm

Unresolved
Line 2 is running at half speed because of a sensor fault. The engineer has been called and arrives at 3 pm.
Owner
The afternoon team leader decides whether customer A’s order moves to line 3.
Next check
Check the cold store temperature at 4 pm. It rose this morning.

From brief to handover

The outgoing team leader goes through the brief with the new shift and adds anything missing.

The afternoon shift signs off what it takes over. That makes ownership clear.

The outgoing team leader checks the brief. Safety issues are always handed over verbally as well.

In an AI Work Session for teams, you build the brief for a real shift change together. After half a day, your team has a fixed checklist.

How does the whole team get this right?

A handover is only reliable when every shift uses the same checklist and knows which procedure applies. Record the checklist, including who owns what.

With AI Workplace Start, we set up the handover around that checklist and the current procedures. Every shift then gets the same information, even when there is a stand-in.

See how AI Workplace Start supports this way of working

What work can an AI assistant take on?

Half an hour before the changeover, an assistant can prepare the brief from reports, the log and the schedule.

Whatever the new shift adds, it includes in the next brief.

How does this become part of the operational week?

Agree when the brief is ready, who goes through it and how you sign off open points.

  • Completeness. How often did a shift discover a problem that wasn’t in the handover?
  • Start-up time. How many minutes after the changeover is everything running at full speed again?
  • Open points. How many points stay open for longer than one shift?

Ask each shift once a week what they missed in the handover.

When does a system of your own pay off?

Do reports from planning, maintenance and production need to come together during the shift, from different systems? Then an up-to-date brief needs an integration of your own.

With Custom AI, Sachs AI first looks at whether a solution of your own is worth the investment. We help you choose a development partner and can manage the build.